联系安达尔仪器
CONTACT US
一、实验准备The Prepare for Experiment
1.按照安装说明将各部件安装好
According to the installation instructions for the parts will be installed
2.按下设备蓝色启动按钮,启动风机,启动加热器
Press equipment blue button, start the blower, start the heater
3.设定进风温度
Set the air inlet temperature value
4.待出风温度达到设定值时,开启蠕动泵自动
When the air outlet temperature reached setting value, open the peristaltic pump
automatically
5.先进水,观察物料雾化及温度变化情况,重新设定风机、进风温度,待稳定后
进料
Import water firstly, and observe the change of materials and temperature, and r
eset the speed of the fan and the temperature of the air inlet , and import mat
erial after stable 。
二、停机步骤Stop Steps
1.当物料用完后,进水将胶管内的物料全部喷完后(约5 分钟),关闭蠕动泵
When the material is used out, import water and spray all the material within the hose
(about 5 minutes), closes the peristaltic pump
2.关闭空压机
Close the air compressor
3.关闭加热器
Close the heater
4.待进风温度降至40 度以下时,关闭风机
When the temperature of air inlet drop to 40 C°, close the fan
5.取下集料瓶,将物料转移到其他容器中
Take the fixation material bottle down, transfer the material to other container
6.容器完全冷却后取下清洗
When the container become to cool completely, take down and clean it。__
1.按照安装说明将各部件安装好
According to the installation instructions for the parts will be installed
2.按下设备蓝色启动按钮,启动风机,启动加热器
Press equipment blue button, start the blower, start the heater
3.设定进风温度
Set the air inlet temperature value
4.待出风温度达到设定值时,开启蠕动泵自动
When the air outlet temperature reached setting value, open the peristaltic pump
automatically
5.先进水,观察物料雾化及温度变化情况,重新设定风机、进风温度,待稳定后
进料
Import water firstly, and observe the change of materials and temperature, and r
eset the speed of the fan and the temperature of the air inlet , and import mat
erial after stable 。
二、停机步骤Stop Steps
1.当物料用完后,进水将胶管内的物料全部喷完后(约5 分钟),关闭蠕动泵
When the material is used out, import water and spray all the material within the hose
(about 5 minutes), closes the peristaltic pump
2.关闭空压机
Close the air compressor
3.关闭加热器
Close the heater
4.待进风温度降至40 度以下时,关闭风机
When the temperature of air inlet drop to 40 C°, close the fan
5.取下集料瓶,将物料转移到其他容器中
Take the fixation material bottle down, transfer the material to other container
6.容器完全冷却后取下清洗
When the container become to cool completely, take down and clean it。__